SCR is Preparing for the Autumn-Winter Period
01.10.2013
South Caucasus Railway conducts work on training the production units and workers for the autumn -winter period. A set of measures are aimed at ensuring the stable operation of the railway in the autumn and winter focusing on snow fighting facilities, repair work, HR trainings.
Meanwhile preparation of production units of infrastructure and rolling stock will be held as a part of the autumn commission inspection. As part of the autumn inspection railway roadbed and structures, devices, energy and communications will be tested in the period up to November 15. Also a program on emergency, security, workers’ winter clothing and footwear, track improvement will be implemented.
Up to November 25 the commission  is going to inspect locomotives and motor- wagon rolling stock of SCR. A particular attention is paid to the fire safety systems, devices and equipment for ensuring safety of trains.
The process of inspections is discussed at the weekly conference calls.
Main page
Share |
ЗАО "ЮКЖД" 2011 г.